What is Defect Age?
Thread Tags
Adobe Illustrator Adobe InDesign Adobe Photoshop Android Development Android Programming Android Studio Automation Testing C / C++ Programming Career Options College Lounge css digital marketing Digital Marketing / SEO Fireworks Graphic Design Graphic designing Graphics Design Graphics Designing HTML? Illustrator Internship Training logo Design logo designing Magento Photoshop PHP Programming QA react-native Scroll Website SEO Single Page Website Stock Managment System Testing Typography UI UI/UX Development UI Design UI Designing UI development User Interface UX Design Web Designing Website Design Wordpress wpRegister for free!
Registration at Smart Mentors is completely free and takes only a few seconds. By registering you’ll gain:
- Full Posting Privileges.
- Access to Private Messaging.
- Optional Email Notification.
- Ability to Fully Participate.
Register Now, or check out the Site Tour and find out everything Smart Mentors has to offer.
This thread contains 1 reply, has 2 voices, and was last updated by Urvish 1 year, 11 months ago.
- Author Replies
- February 16, 2019 at 11:17 am #53714
Defect age can be determined as the time interval between the date of defect detected and date of defect closure.
Defect Age = Date of defect closure – Date of defect detected
Assume, a tester found a bug and reported it on 1st Feb 2019 and it was successfully fixed on 5th Feb 2019. So the defect age is 5 days.
- AuthorPosts
Viewing 1 reply thread
You must be logged in to reply to this thread.Please login or register. Registration is 100% free.